The National Gas Company of Trinidad and Tobago Limited (NGC) wishes to advise that it will commence inspection and repair works of its 6-inch natural gas pipeline located in the Diamond Vale Industrial Park, Diego Martin.
Works include, but are not limited to:
- depressuring the pipeline
- excavation
- controlled flaring
Schedule of Works:
Start: Friday 22nd September 2023 from 6:00 pm
End: Sunday 24th September 2023 at 6:00 pm
The Trinidad and Tobago Police Service (TTPS) will be present to assist with traffic management. The Trinidad and Tobago Fire Services will be present during the controlled flaring.